RX3i CPU hardware (IC695CPU310). In this mode, all of the system’s capabilities are fully
operational. At the end of the demo period, PLC A will either stop immediately, if it is the
backup, or begin an orderly transfer of Mastership to PLC B. If the transfer is successful, then
PLC A will shut down automatically. At this point, the system will be operating in a non-redundant manner.
A Max-ON RX3i system that is installed in a production environment MUST be running on a
Max-ON RX3i CPU (IC695CMU310) in order to allow PLC A to run indefinitely.
Running Max-ON RX3i on a standard RX3i CPU is helpful for short times in case of a
hardware failure or for non-production demonstration purposes.
In the declaration of the Max-ON RX3i Configuration Tools Release 3:09, I have declared Configuring Genius Discrete Inputs I929 Primary Bus%, respectively Secondary Bus% R16059. When I download the program initiated PLC% I look at the table, you state, but when observed Redundancy% R does not see the flag status, respectively.
Genius I/O Devices running on BEM BA 331A, switch to bus no status I / O BEM331B .
Hope you directions or how to crack Demo Mode Operation Max-ON RX3i Application to Release 3:09.