i don't have any experience in transacting with profibus PA, so i sent this subject to find an explanation in the shortest time.
according to my attachment:
1) how can i check the healthy of the profibus PA BY other words ( what is the job of the terminator switch ) & what is the correct measuring value ?
2) state 1
- what is the procedures if i need to replace the instrument [33] by new one ( i have to shut down the plant or what )?
3) state 2
- what happen if the junction box ( JPA10 ) is going be defected the whole of the bus will out of service ( it is possible )?
- what is the procedures to exchange this box by new one ( i have to shut down the plant or not )?
4) state 3
- i like to know the steps if the previous setuations ( in state 2 ) are happened in this box .
5) state 4
- if i need to change the instrument [ 49 ] what is the steps.
6) state 5
- what will the situation be if the terminator switch opened?
I know it is the basics but i came to here to keep the time and also to get an practical reply.
thanks in advance


maher